Title 40--PROTECTION OF ENVIRONMENT
Chapter I--ENVIRONMENTAL PROTECTION AGENCY


subparts B and C, the provisions of this part apply to the owner or operator of any stationary source which contains an affected facility, the construction or modification of...


the Act or in this section as follows: Act means the Clean Air Act (42 U.S.C. 7401 et seq.) Administrator means the Administrator of the Environmental Protection Agency or...


symbols of units of measure. These are defined as follows: (a) System International (SI) units of...


symbols of units of measure. These are defined as follows: (a) System International (SI) units of...
...


symbols of units of measure. These are defined as follows: (a) System International (SI) units of...
...
...


to do so by an owner or operator, the Administrator will make a determination of whether action taken or intended to be taken by such owner or operator constitutes...


so by an owner or operator, the Administrator will review plans for construction or modification for the purpose of providing technical advice to the owner or operator. (b)(1)...


to the provisions of this part shall furnish the Administrator written notification or, if acceptable to both the Administrator and the owner or operator of a...


maximum production rate at which the affected facility will be operated, but not later than 180 days after initial startup of such facility and at such other times as may be...


information provided to, or otherwise obtained by, the Administrator under this part shall be governed by part 2 of this chapter. (Information submitted voluntarily to...


construed in any manner to preclude any State or political subdivision thereof from: (a) Adopting and enforcing any emission standard or limitation applicable to an...


(a) Compliance with standards in this part, other than opacity standards, shall be determined in accordance with performance tests established by Sec. 60.8, unless otherwise specified...


this part shall build, erect, install, or use any article, machine, equipment or process, the use of which conceals an emission which would otherwise constitute a violation...


section, all continuous monitoring systems required under applicable subparts shall be subject to the provisions of this section upon promulgation of performance specifications...


and (f) of this section, any physical or operational change to an existing facility which results in an increase in the emission rate to the atmosphere of any pollutant to which...


an affected facility, irrespective of any change in emission rate. (b) ``Reconstruction'' means the replacement of components of an existing facility to such an...


Priority Number \1\...


are incorporated by reference in the corresponding sections noted. These incorporations by reference were approved by the Director of the Federal Register on the date listed....


section contains requirements for control devices used to comply with applicable subparts of parts 60 and 61. The requirements are placed here for administrative convenience and...


For the purposes of this part, time periods specified in days shall be measured in calendar days, even if the word ``calendar'' is absent, unless otherwise specified in an...


Source: 40 FR 53346, Nov. 17, 1975, unless otherwise noted. The provisions of this subpart apply to States upon publication of a final guideline document...


Terms used but not defined in this subpart shall have the meaning given them in the Act and in subpart A: (a) Designated pollutant means any air pollutant, emissions...


Publication of guideline documents, emission guidelines, and final compliance times. (a) Concurrently upon or after proposal of standards of performance for the control of a...


Adoption and submittal of State plans; public hearings. (a)(1) Unless otherwise specified in the applicable subpart, within 9 months after notice of the availability of a...


Emission standards and compliance schedules. (a) Each plan shall include emission standards and compliance schedules. (b)(1) Emission standards shall prescribe allowable rates...


Emission inventories, source surveillance, reports. (a) Each plan shall include an inventory of all designated facilities, including emission data for the designated pollutants...


Legal authority. (a) Each plan shall show that the State has legal authority to carry out the plan, including authority to: (1) Adopt emission standards and compliance...


by the Administrator. (a) The Administrator may, whenever he determines necessary, extend the period for submission of any plan or plan revision or portion thereof. ...


Plan revisions by the State. (a) Plan revisions which have the effect of delaying compliance with applicable emission standards or increments of progress or of establishing...


revisions by the Administrator. After notice and opportunity for public hearing in each affected State, the Administrator may revise any provision of an applicable plan if: ...


guidelines and compliance times for the control of certain designated pollutants in accordance with section 111(d) and section 129 of the Clean Air Act and subpart B of...


[Code of Federal Regulations] [Title 40, Volume 6] [Revised as of July 1, 2001] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR60.31] [Page 72] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES--Table of Contents Subpart C--Emission Guidelines and Compliance Times Sec. 60.31 Definitions. Terms used but not defined in this subpart have the meaning given them in the Act and in subparts A and B of this part. [42 FR 55797, Oct. 18, 1977] Subpart Ca [Reserved] ...


20, 1994 Sec. 60.30b Scope. Source: 60 FR 65415, Dec. 19, 1995, unless otherwise noted. This subpart contains...


20, 1994 Sec. 60.31b Definitions. Terms used but not defined in this subpart have the meaning given them in the Clean Air Act...


20, 1994 Sec. 60.32b Designated facilities. (a) The designated facility to which these guidelines apply is each municipal...


20, 1994 Sec. 60.33b Emission guidelines for municipal waste combustor metals, acid gases, organics, and nitrogen oxides. (a)...


20, 1994 Sec. 60.34b Emission guidelines for municipal waste combustor operating practices. (a) For approval, a State plan...


20, 1994 Sec. 60.35b Emission guidelines for municipal waste combustor operator training and certification. For approval, a State...


20, 1994 Sec. 60.36b Emission guidelines for municipal waste combustor fugitive ash emissions. For approval, a State plan shall...


20, 1994 Sec. 60.37b Emission guidelines for air curtain incinerators. For approval, a State plan shall include emission limits...


20, 1994 Sec. 60.38b Compliance and performance testing. (a) For approval, a State plan shall include the performance...


20, 1994 Sec. 60.39b Reporting and recordkeeping guidelines and compliance schedules. (a) For approval, a State plan shall...


Scope. Source: 61 FR 9919, Mar. 12, 1996, unless otherwise noted. This subpart contains emission guidelines and compliance times for the control of...


Definitions. Terms used but not defined in this subpart have the meaning given them in the Act and in subparts A, B, and WWW of this part. Municipal solid waste...


Designated facilities. (a) The designated facility to which the guidelines apply is each existing MSW landfill for which construction, reconstruction or modification...


Emission guidelines for municipal solid waste landfill emissions. (a) For approval, a State plan shall include control of MSW landfill emissions at each MSW landfill...


Test methods and procedures. For approval, a State plan shall include provisions for: the calculation of the landfill NMOC emission rate listed in Sec. 60.754, as...


Reporting and recordkeeping guidelines. For approval, a State plan shall include the recordkeeping and reporting provisions listed in Secs. 60.757 and 60.758, as...


Compliance times. (a) Except as provided for under paragraph (b) of this section, planning, awarding of contracts, and installation of MSW landfill air emission...


Designated facilities. Source: 60 FR 65414, Dec. 19, 1995, unless otherwise noted. Sulfuric acid production units. The designated facility to which Secs. 60.31d...


Emissions guidelines. Sulfuric acid production units. The emission guideline for designated facilities is 0.25 grams sulfuric acid mist (as measured by EPA Reference Method...


Compliance times. Sulfuric acid production units. Planning, awarding of contracts, and installation of equipment capable of attaining the level of the emission...


Scope. Source: 62 FR 48379, Sept. 15, 1997, unless otherwise noted. This subpart contains emission guidelines and compliance times for the control of...


Definitions. Terms used but not defined in this subpart have the meaning given them in the Clean Air Act and in subparts A, B, and Ec of this part. ...


Designated facilities. (a) Except as provided in paragraphs (b) through (h) of this section, the designated facility to which the guidelines apply is...


Emission guidelines. (a) For approval, a State plan shall include the requirements for emission limits at least as protective as those requirements listed in Table...


Operator training and qualification guidelines. For approval, a State plan shall include the requirements for operator training and qualification at least as...


Waste management guidelines. For approval, a State plan shall include the requirements for a waste management plan at least as protective as those requirements...


Inspection guidelines. (a) For approval, a State plan shall require that each small HMIWI subject to the emission limits under Sec. 60.33e(b) undergo an...


Compliance, performance testing, and monitoring guidelines. (a) Except as provided in paragraph (b) of this section, for approval, a State plan shall include...


Reporting and recordkeeping guidelines. (a) For approval, a State plan shall include the reporting and recordkeeping requirements listed in Sec. 60.58c(b), (c), (d),...


Compliance times. (a) Not later than September 15, 1998, each State in which a designated facility is operating shall submit to the Administrator a plan...


August 17, 1971 Sec. 60.40 Applicability and designation of affected facility. (a) The affected facilities to which the provisions of this...


60.41 Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act, and in subpart A of this part. ...


Standard for particulate matter. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner...


Standard for sulfur dioxide. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or...


60.44 Standard for nitrogen oxides. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner...


60.45 Emission and fuel monitoring. (a) Each owner or operator shall install, calibrate, maintain, and operate continuous monitoring systems for measuring...


60.46 Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods...


1978 Sec. 60.40a Applicability and designation of affected facility. Source: 44 FR 33613, June 11, 1979, unless...


1978 Sec. 60.41a Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in...


1978 Sec. 60.42a Standard for particulate matter. (a) On and after the date on which the performance test required...


1978 Sec. 60.43a Standard for sulfur dioxide. (a) On and after the date on which the initial performance test required to...


1978 Sec. 60.44a Standard for nitrogen oxides. (a) On and after the date on which the initial performance test required...


1978 Sec. 60.45a Commercial demonstration permit. (a) An owner or operator of an affected facility proposing to demonstrate...


1978 Sec. 60.46a Compliance provisions. (a) Compliance with the particulate matter emission limitation under...


1978 Sec. 60.47a Emission monitoring. (a) The owner or operator of an affected facility shall install, calibrate,...


1978 Sec. 60.48a Compliance determination procedures and methods. (a) In conducting the performance tests required in...


1978 Sec. 60.49a Reporting requirements. (a) For sulfur dioxide, nitrogen oxides, and particulate matter emissions,...


Applicability and delegation of authority. (a) The affected facility to which this subpart applies is each steam generating unit that commences...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. Annual...


Standard for sulfur dioxide. (a) Except as provided in paragraphs (b), (c), (d), or (j) of this section, on and after the date on which the performance test...


Standard for particulate matter. (a) On and after the date on which the initial performance test is completed or is required to be completed under Sec. 60.8 of...


Standard for nitrogen oxides. (a) Except as provided under paragraphs (k) and (l) of this section, on and after the date on which the initial performance test...


Compliance and performance test methods and procedures for sulfur dioxide. (a) The sulfur dioxide emission standards under Sec. 60.42b apply at all times. (b)...


Compliance and performance test methods and procedures for particulate matter and nitrogen oxides. (a) The particulate matter emission standards and opacity...


Emission monitoring for sulfur dioxide. (a) Except as provided in paragraphs (b) and (f) of this section, the owner or operator of an affected facility subject to...


Emission monitoring for particulate matter and nitrogen oxides. (a) The owner or operator of an affected facility subject to the opacity standard under Sec....


Reporting and recordkeeping requirements. (a) The owner or operator of each affected facility shall submit notification of the date of initial startup, as provided...


Applicability and delegation of authority. Source: 55 FR 37683, Sept. 12, 1990, unless otherwise noted. (a) Except as provided in paragraph (d) of...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Clean Air Act and in subpart A of this part. ...


Standard for sulfur dioxide. (a) Except as provided in paragraphs (b), (c), and (e) of this section, on and after the date on which the initial performance test...


Standard for particulate matter. (a) On and after the date on which the initial performance test is completed or required to be...


Compliance and performance test methods and procedures for sulfur dioxide. (a) Except as provided in paragraphs (g) and (h) of this section and in Sec....


Compliance and performance test methods and procedures for particulate matter. (a) The owner or operator of an affected facility subject to the PM and/or...


Emission monitoring for sulfur dioxide (a) Except as provided in paragraphs (d) and (e) of this section, the owner or operator of an affected facility subject...


Emission monitoring for particulate matter. (a) The owner or operator of an affected facility combusting coal, residual oil, or wood that is subject to the...


Reporting and recordkeeping requirements. (a) The owner or operator of each affected facility shall submit notification of the date of construction...


(a) The provisions of this subpart are applicable to each incinerator of more than 45 metric tons per day charging [[Page 146]] rate (50...


not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Incinerator means any furnace used in the process of burning solid waste for...


after the date on which the initial performance test is completed or required to be completed under Sec. 60.8 of this part, whichever date comes first, no owner or operator subject to...


[Code of Federal Regulations] [Title 40, Volume 6] [Revised as of July 1, 2001] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR60.53] [Page 146] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES--Table of Contents Subpart E--Standards of Performance for Incinerators Sec. 60.53 Monitoring of operations. (a) The owner or operator of any incinerator subject to the provisions of this part shall record the daily charging rates and hours of operation. ...


the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other methods...


September 20, 1994 Sec. 60.50a Applicability and delegation of authority. Source: 56 FR 5507, Feb. 11, 1991, unless...


September 20, 1994 Sec. 60.51a Definitions. ASME means the American Society of Mechanical Engineers. Batch MWC means an...


September 20, 1994 Sec. 60.52a Standard for municipal waste combustor metals. (a) On and after the date on which the...


September 20, 1994 Sec. 60.53a Standard for municipal waste combustor organics. (a) [Reserved] (b) On and after the date...


September 20, 1994 Sec. 60.54a Standard for municipal waste combustor acid gases. (a)--(b) [Reserved] (c) On and after the...


September 20, 1994 Sec. 60.55a Standard for nitrogen oxides. On and after the date on which the initial compliance test...


September 20, 1994 Sec. 60.56a Standards for municipal waste combustor operating practices. (a) On and after the date on which...


September 20, 1994 Sec. 60.58a Compliance and performance testing. (a) The standards under this subpart apply at all times,...


September 20, 1994 Sec. 60.59a Reporting and recordkeeping requirements. (a) The owner or operator of an affected facility...


for Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.50b Applicability and delegation...


for Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.51b Definitions. Air curtain...


for Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.52b Standards for municipal waste...


for Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.53b Standards for municipal waste...


for Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.54b Standards for municipal waste...


Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.55b Standards for municipal waste combustor...


for Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.56b Standards for air curtain...


for Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.57b Siting requirements. (a) The...


for Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.57b Siting requirements. (a) The...
...


for Which Modification or Reconstruction is Commenced After June 19, 1996 Sec. 60.59b Reporting and...


1996 Sec. 60.50c Applicability and delegation of authority. Source: 62 FR 48382, Sept. 15, 1997, unless...


1996 Sec. 60.51c Definitions. Batch HMIWI means an HMIWI that is designed such that neither waste charging nor ash...


1996 Sec. 60.52c Emission limits. (a) On and after the date on which the initial performance test is completed or...


1996 Sec. 60.53c Operator training and qualification requirements. (a) No owner or operator of an affected facility...


1996 Sec. 60.54c Siting requirements. (a) The owner or operator of an affected facility for which construction is...


1996 Sec. 60.55c Waste management plan. The owner or operator of an affected facility shall prepare a waste management...


1996 Sec. 60.56c Compliance and performance testing. (a) The emission limits under this subpart apply at all times...


1996 Sec. 60.57c Monitoring requirements. (a) The owner or operator of an affected facility shall install, calibrate...


1996 Sec. 60.58c Reporting and recordkeeping requirements. (a) The owner or operator of an affected facility shall...


designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in portland cement plants: Kiln, clinker cooler,...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Portland cement plant means any facility manufacturing portland cement...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


operator of any portland cement plant subject to the provisions of this part shall record the daily production rates and kiln feed rates. (b) Except as provided in paragraph...


conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other methods...


(a) Each owner or operator required to install a continuous opacity monitoring system under Sec. 60.63(b) shall submit reports of excess emissions as defined in Sec. 60.63(d)....


and enforcement authority to a State under section 111(c) of the Act, the authorities contained in paragraph (b) of this section shall be retained by the...


(a) The provisions of this subpart are applicable to each nitric acid production unit, which is the affected facility. (b) Any facility under paragraph (a) of this...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Nitric acid production unit means any facility producing weak nitric acid...


after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to be...


operator shall install, calibrate, maintain, and operate a continuous monitoring system for measuring nitrogen oxides (NO<INF>x</INF>). The pollutant gas mixtures...


conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other methods...


(a) The provisions of this subpart are applicable to each sulfuric acid production unit, which is the affected facility. (b) Any facility under paragraph (a) of...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Sulfuric acid production unit means any facility producing sulfuric acid...


after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to be...


date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to be discharged...


system for the measurement of sulfur dioxide shall be installed, calibrated, maintained, and operated by the owner or operator. The pollutant gas used to prepare...


conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other methods...


(a) The affected facility to which the provisions of this subpart apply is each hot mix asphalt facility. For the purpose of this subpart, a hot mix asphalt facility...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Hot mix asphalt facility means any facility, as described in Sec....


On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall discharge...


conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other methods...


reconstruction. (a) The provisions of this subpart are applicable to the following affected facilities in petroleum refineries: fluid catalytic cracking unit...


terms not defined herein shall have the meaning given them in the Act and in subpart A. (a) Petroleum refinery means any facility engaged in producing gasoline,...


Each owner or operator of any fluid catalytic cracking unit catalyst regenerator that is subject to the requirements of this subpart shall comply with the emission limitations set forth...


or operator of any fluid catalytic cracking unit catalyst regenerator that is subject to the requirements of this subpart shall comply with the emission limitations set forth in...


or operator that is subject to the requirements of this subpart shall comply with the emission limitations set forth in this section on and after the date on which the...


(a) Continuous monitoring systems shall be installed, calibrated, maintained, and operated by the owner or operator subject to the provisions of this subpart as follows: (1)...


conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other...


(a) Each owner or operator subject to Sec. 60.104(b) shall notify the Administrator of the specific provisions of Sec. 60.104(b) with which the owner or operator seeks to...


(a) Section 60.8(d) shall apply to the initial performance test specified under paragraph (c) of this section, but not to the daily performance tests required thereafter as...


and enforcement authority to a State under section 111(c) of the Act, the authorities contained in paragraph (b) of this section shall be retained by the...


Commenced After June 11, 1973, and Prior to May 19, 1978 Sec. 60.110 Applicability and designation of affected facility. (a) Except as provided in...


Commenced After June 11, 1973, and Prior to May 19, 1978 Sec. 60.111 Definitions. As used in this subpart, all terms not defined herein shall have...


Commenced After June 11, 1973, and Prior to May 19, 1978 Sec. 60.112 Standard for volatile organic compounds (VOC). (a) The owner or operator of any...


Commenced After June 11, 1973, and Prior to May 19, 1978 Sec. 60.113 Monitoring of operations. (a) Except as provided in paragraph (d) of this section,...


Commenced After May 18, 1978, and Prior to July 23, 1984 Sec. 60.110a Applicability and designation of affected facility. (a) Affected...


Commenced After May 18, 1978, and Prior to July 23, 1984 Sec. 60.111a Definitions. In addition to the terms and their definitions listed in the Act...


Commenced After May 18, 1978, and Prior to July 23, 1984 Sec. 60.112a Standard for volatile organic compounds (VOC). (a) The owner or operator of...


Commenced After May 18, 1978, and Prior to July 23, 1984 Sec. 60.113a Testing and procedures. (a) Except as provided in Sec. 60.8(b) compliance with...


Commenced After May 18, 1978, and Prior to July 23, 1984 Sec. 60.114a Alternative means of emission limitation. (a) If, in the Administrator's...


Commenced After May 18, 1978, and Prior to July 23, 1984 Sec. 60.115a Monitoring of operations. (a) Except as provided in paragraph (d) of this section,...


Construction, Reconstruction, or Modification Commenced After July 23, 1984 Sec. 60.110b Applicability and designation of...


Construction, Reconstruction, or Modification Commenced After July 23, 1984 Sec. 60.111b Definitions. Terms used in...


Construction, Reconstruction, or Modification Commenced After July 23, 1984 Sec. 60.113b Testing and procedures. The...


Reconstruction, or Modification Commenced After July 23, 1984 Sec. 60.114b Alternative means of...


Construction, Reconstruction, or Modification Commenced After July 23, 1984 Sec. 60.115b Reporting and...


Construction, Reconstruction, or Modification Commenced After July 23, 1984 Sec. 60.116b Monitoring of operations. (a)...


Reconstruction, or Modification Commenced After July 23, 1984 Sec. 60.117b Delegation of authority. (a)...


(a) The provisions of this subpart are applicable to the following affected facilities in secondary lead smelters: Pot furnaces of more than 250 kg (550 lb)...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Reverberatory furnace includes the following types of...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall discharge...


(a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in Appendix A of this part or...


Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to the following affected facilities in secondary brass or...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Brass or bronze means...


Standard for particulate matter. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject...


Test methods and procedures. (a) In conducting performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods...


11, 1973 Sec. 60.140 Applicability and designation of affected facility. (a) The affected facility to which the provisions...


11, 1973 Sec. 60.141 Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in...


11, 1973 Sec. 60.142 Standard for particulate matter. (a) Except as provided under paragraph (b) of this section, on...


11, 1973 Sec. 60.143 Monitoring of operations. (a) The owner or operator of an affected facility shall maintain a...


11, 1973 Sec. 60.144 Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the...


Commenced After January 20, 1983 Sec. 60.140a Applicability and designation of affected facilities. Source: 51 FR 161, Jan. 2, 1986,...


Commenced After January 20, 1983 Sec. 60.141a Definitions. All terms in this subpart not defined below are given the same meaning as...


Commenced After January 20, 1983 Sec. 60.142a Standards for particulate matter. (a) Except as provided under paragraphs (b) and (c) of...


Commenced After January 20, 1983 Sec. 60.143a Monitoring of operations. (a) Each owner or operator of an affected facility shall...


Commenced After January 20, 1983 Sec. 60.144a Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8,...


Commenced After January 20, 1983 Sec. 60.145a Compliance provisions. (a) When determining compliance with mass and visible emission...


(a) The affected facility is each incinerator that combusts wastes containing more than 10 percent sewage sludge (dry basis) produced by municipal sewage...


[Code of Federal Regulations] [Title 40, Volume 6] [Revised as of July 1, 2001] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR60.151] [Page 248] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES--Table of Contents Subpart O--Standards of Performance for Sewage Treatment Plants Sec. 60.151 Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. [39 FR 9319, Mar. 8, 1974] ...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator of any sewage sludge incinerator subject to the...


owner or operator of any sludge incinerator subject to the provisions of this subpart shall: (1) Install, calibrate, maintain, and operate a flow measuring device which can be...


(a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in Appendix A of this part or other...


any multiple hearth, fluidized bed, or electric sludge incinerator subject to the provisions of this subpart shall submit to the Administrator semi-annually a report in writing...


implementation and enforcement authority to a State under section 111(c) of the Act, the authorities contained in paragraph (b) of this section shall be retained by the...


Source: 41 FR 2338, Jan. 15, 1976, unless otherwise noted. (a) The provisions of this subpart are applicable to the following affected facilities in primary...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Primary copper smelter means any installation or any...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


owner or operator of any primary copper smelter subject to Sec. 60.163 (b) shall keep a monthly record of the total smelter charge and the weight percent (dry basis) of arsenic,...


conducting performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other methods...


Source: 41 FR 2340, Jan. 15, 1976, unless otherwise noted. (a) The provisions of this subpart are applicable to the following affected facilities in primary...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Primary zinc smelter means any installation engaged in the production,...


On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


or operator of any primary zinc smelter subject to the provisions of this subpart shall install and operate: (1) A continuous monitoring system to monitor and record the opacity...


In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other...


Source: 41 FR 2340, Jan. 15, 1976, unless otherwise noted. (a) The provisions of this subpart are applicable to the following affected facilities in primary...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Primary lead smelter means any installation or any intermediate...


On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


or operator of any primary lead smelter subject to the provisions of this subpart shall install and operate: (1) A continuous monitoring system to monitor and record the opacity...


In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other...


Applicability and designation of affected facility. Source: 45 FR 44207, June 30, 1980, unless otherwise noted. (a) The affected facilities in primary aluminum...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. Aluminum equivalent means an...


Standard for fluorides. (a) On and after the date on which the initial performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to...


Standard for visible emissions. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to...


Monitoring of operations. (a) The owner or operator of any affected facility subject to the provisions of this subpart shall install, calibrate, maintain, and operate...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test...


Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each wet-process phosphoric...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a)...


Standard for fluorides. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed,...


Monitoring of operations. (a) The owner or operator of any wet-process phosphoric acid plant subject to the provisions of this subpart shall install,...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures...


Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each superphosphoric acid...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a)...


Standard for fluorides. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject...


Monitoring of operations. (a) The owner or operator of any superphosphoric acid plant subject to the provisions of this subpart shall install, calibrate,...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures...


Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each granular diammonium...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a)...


Standard for fluorides. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject...


Monitoring of operations. (a) The owner or operator of any granular diammonium phosphate plant subject to the provisions of this subpart shall install,...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the...


Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is each triple superphosphate plant...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a)...


Standard for fluorides. On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to...


Monitoring of operations. The owner or operator of any triple superphosphate plant subject to the provisions of this subpart shall install, calibrate, maintain,...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the...


60.240 Applicability and designation of affected facility. (a) The affected facility to which the provisions of this subpart apply is...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. ...


Standard for fluorides. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or...


Monitoring of operations. (a) The owner or operator of any granular triple superphosphate storage facility subject to the provisions of this subpart...


(a) The provisions of this subpart are applicable to any of the following affected facilities in coal preparation plants which process more than 181 Mg (200 tons)...


all terms not defined herein have the meaning given them in the Act and in subpart A of this part. (a) Coal preparation plant means any facility (excluding underground...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, an owner or operator subject to the provisions of this subpart shall not cause...


or operator of any thermal dryer shall install, calibrate, maintain, and continuously operate monitoring devices as follows: (1) A monitoring device for the measurement of...


(a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other...


Source: 41 FR 18501, May 4, 1976, unless otherwise noted. (a) The provisions of this subpart are applicable to the following affected facilities:...


subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Electric submerged arc furnace means any furnace...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no [[Page 272]] owner or operator subject to the provisions of...


or operator subject to the provisions of this subpart shall install, calibrate, maintain and operate a continuous monitoring system for measurement of the opacity of emissions...


(a) The owner or operator of any electric submerged arc furnace subject to the provisions of this subpart shall maintain daily records of the following information: (1) Product...


(a) During any performance test required in Sec. 60.8, the owner or operator shall not allow gaseous diluents to be added to the effluent gas stream after the fabric in an open...


1983 Sec. 60.270 Applicability and designation of affected facility. (a) The provisions of this subpart are applicable to...


1983 Sec. 60.271 Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them...


1983 Sec. 60.272 Standard for particulate matter. (a) On and after the date on which the performance test required to...


1983 Sec. 60.273 Emission monitoring. (a) A continuous monitoring system for the measurement of the opacity of...


1983 Sec. 60.274 Monitoring of operations. (a) The owner or operator subject to the provisions of this subpart...


1983 Sec. 60.275 Test methods and procedures. (a) During performance tests required in Sec. 60.8, the owner or...


1983 Sec. 60.276 Recordkeeping and reporting requirements. (a) Operation at a furnace static pressure that exceeds the...


August 17, 1983 Sec. 60.270a Applicability and designation of affected facility. Source: 49 FR 43845, Oct. 31, 1984, unless...


August 17, 1983 Sec. 60.271a Definitions. As used in this subpart, all terms not defined herein shall have the meaning...


August 17, 1983 Sec. 60.272a Standard for particulate matter. (a) On and after the date of which the performance test required to...


August 17, 1983 Sec. 60.273a Emission monitoring. (a) Except as provided under paragraphs (b) and (c) of this section,...


August 17, 1983 Sec. 60.274a Monitoring of operations. (a) The owner or operator subject to the provisions of this subpart...


August 17, 1983 Sec. 60.275a Test methods and procedures. (a) During performance tests required in Sec. 60.8, the owner...


August 17, 1983 Sec. 60.276a Recordkeeping and reporting requirements. (a) Records of the measurements required in Sec....


(a) The provisions of this subpart are applicable to the following affected facilities in kraft pulp mills: Digester system, brown stock washer system,...


terms not defined herein shall have the same meaning given them in the Act and in subpart A. (a) Kraft pulp mill means any stationary source which produces pulp from wood...


and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause...


(a) Any owner or operator subject to the provisions of this subpart shall install, calibrate, maintain, and operate the following continuous monitoring systems: (1) A...


conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other methods...


(a) Each glass melting furnace is an affected facility to which the provisions of this subpart apply. (b) Any facility under paragraph (a) of this section...


As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part, unless otherwise required by the context. ...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator of a glass melting furnace subject...


[Code of Federal Regulations] [Title 40, Volume 6] [Revised as of July 1, 2001] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR60.293] [Page 294] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES--Table of Contents Subpart CC--Standards of Performance for Glass Manufacturing Plants Secs. 60.294-60.295 [Reserved] ...


a glass melting furnace with modified processes is changed to one without modified processes or if a glass melting furnace without modified processes is changed to one with...


Source: 43 FR 34347, Aug. 3, 1978, unless otherwise noted. (a) The provisions of this subpart apply to each affected facility at any grain terminal elevator or...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Grain means corn, wheat, sorghum, rice, rye, oats, barley, and soybeans. ...


(a) On and after the 60th day of achieving the maximum production rate at which the affected facility will be operated, but no later than 180 days after initial startup, no owner or...


the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other methods...


used in place of ``annual asset guidelines repair allowance percentage,'' to determine whether a capital expenditure as defined by Sec. 60.2 has been made to an existing facility. ...


Applicability and designation of affected facility. Source: 47 FR 49287, Oct. 29, 1982, unless otherwise noted. (a) The affected facility to which the provisions of...


Definitions and symbols. (a) All terms used in this subpart not defined below are given the meaning in the Act and in subpart A of this part. Bake oven means a device...


Standard for volatile organic compounds (VOC). (a) On and after the date on which the initial performance test required to be conducted by Sec. 60.8(a) is completed, no owner...


Performance tests and compliance provisions. (a) Section 60.8(d) and (f) do not apply to the performance test procedures required by this subpart. (b) The owner or...


Monitoring of emissions and operations. (a) The owner or operator of an affected facility which uses a capture system and an incinerator to comply with the emission...


Reporting and recordkeeping requirements. (a) The reporting requirements of Sec. 60.8(a) apply only to the initial performance test. Each owner or operator subject to...


Test methods and procedures. (a) The reference methods in appendix A to this part except as provided under Sec. 60.8(b) shall be used to determine compliance with Sec. 60.312...


(a) The provisions of this subpart are applicable to the following affected facilities: All stationary gas turbines with a heat input at peak load equal to or...


terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Stationary gas turbine means any simple cycle gas turbine,...


(a) On and after the date on which the performance test required by Sec. 60.8 is completed, every owner or operator subject to the provisions of this subpart as specified in paragraphs...


after the date on which the performance test required to be conducted by Sec. 60.8 is completed, every owner or operator subject to the provision of this subpart shall comply with one...


owner or operator of any stationary gas turbine subject to the provisions of this subpart and using water injection to control NO<INF>x</INF> emissions shall install...


(a) To compute the nitrogen oxides emissions, the owner or operator shall use analytical methods and procedures that are accurate to within 5 percent and are approved by the Administrator...


Source: 49 FR 18080, Apr. 26, 1984, unless otherwise noted. (a) The provisions of this subpart are applicable to each rotary lime kiln used in the manufacture...


terms not defined herein shall have the same meaning given them in the Act and in the General Provisions. (a) Lime manufacturing plant means any plant which uses a rotary...


(a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


(a) The owner or operator of a facility that is subject to the provisions of this subpart shall install, calibrate, maintain, and operate a continuous monitoring system, except...


(a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other...


Applicability and designation of affected facility. Source: 47 FR 16573, Apr. 16, 1982, unless otherwise noted. (a) The provisions of this subpart are applicable to...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. (a) Grid casting facility...


Standards for lead. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the...


Monitoring of emissions and operations. The owner or operator of any lead-acid battery manufacturing facility subject to the provisions of this subpart and controlled by...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the...


Applicability and designation of affected facility. Source: 49 FR 6464, Feb. 21, 1984, unless otherwise noted. (a) The provisions of this subpart are applicable to...


Definitions. All terms used in this subpart, but not specifically defined in this section, shall have the meaning given them in the Act and in subpart A of this part. ...


Standard for particulate matter. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to...


Reconstruction. (a) The cost of replacement of ore-contact surfaces on processing equipment shall not be considered in calculating either the ``fixed capital cost of the...


Monitoring of operations. (a) The owner or operator subject to the provisions of this subpart shall install, calibrate, maintain, and operate a monitoring device for the...


Recordkeeping and reporting requirements. (a) The owner or operator subject to the provisions of this subpart shall conduct a performance test and submit to the Administrator...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test...


Applicability and designation of affected facility. Source: 45 FR 85415, Dec. 24, 1980, unless otherwise noted. (a) The provisions of this subpart apply to...


Definitions. (a) All terms used in this subpart that are not defined below have the meaning given to them in the Act and in subpart A of this part. ...


Standards for volatile organic compounds On and after the date on which the initial performance test required by Sec. 60.8 is completed, no owner or operator subject...


Performance test and compliance provisions. (a) Section 60.8 (d) and (f) do not apply to the performance test procedures required by this section. (b) The...


Monitoring of emissions and operations. The owner or operator of an affected facility which uses an incinerator to [[Page 319]] comply with the...


Reporting and recordkeeping requirements. (a) Each owner or operator of an affected facility shall include the data outlined in paragraphs (a)(1) and (2) in...


Reference methods and procedures. (a) The reference methods in appendix A to this part, except as provided in Sec. 60.8 shall be used to conduct performance tests. ...


Modifications. The following physical or operational changes are not, by themselves, considered modifications of existing facilities: (a) Changes as a result...


Modifications. The following physical or operational changes are not, by themselves, considered modifications of existing facilities: (a) Changes as a result...
...


Source: 47 FR 16589, Apr. 16, 1982, unless otherwise noted. (a) The provisions of this subpart are applicable to the following affected facilities used in...


means any plant which produces or prepares phosphate rock product by any or all of the following processes: Mining, beneficiation, crushing, screening, cleaning, drying, calcining,...


On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to the provisions of this subpart shall cause to...


(a) Any owner or operator subject to the provisions of this subpart shall install, calibrate, maintain, and operate a continuous monitoring system, except as provided in...


Source: 45 FR 74850, Nov. 12, 1980, unless otherwise noted. (a) The affected facility to which the provisions of this subpart apply is each ammonium...


all terms not defined herein shall have the meaning given them in the Act and in subpart A. Ammonium sulfate dryer means a unit or vessel into which ammonium sulfate...


On or after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator of an ammonium sulfate dryer subject to the provisions of...


owner or operator of any ammonium sulfate manufacturing plant subject to the provisions of this subpart shall install, calibrate, maintain, and operate flow monitoring devices which can...


(a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or...


Applicability and designation of affected facility. Source: 47 FR 50649, Nov. 8, 1982, unless otherwise noted. (a) Except as provided in paragraph (b) of...


Definitions and notations. (a) All terms used in this subpart that are not defined below have the meaning given to them in the Act and in subpart A of this part. ...


Standard for volatile organic compounds. During the period of the performance test required to be conducted by Sec. 60.8 and after the date required for completion of...


Performance test and compliance provisions. (a) The owner or operator of any affected facility (or facilities) shall conduct performance tests in accordance with...


Monitoring of operations and recordkeeping. (a) After completion of the performance test required under Sec. 60.8, the owner or operator of any affected facility...


Test methods and procedures. (a) The owner or operator of any affected facility using solvent- borne ink systems shall determine the VOC content of the raw inks...


Applicability and designation of affected facility. Source: 48 FR 48375, Oct. 18, 1983, unless otherwise noted. (a) The affected facility to which the...


Definitions and symbols. (a) Except as otherwise required by the context, terms used in this subpart are defined in the Act, in subpart A of this part, or in...


Standard for volatile organic compounds. (a) On and after the date on which the performance test required by Sec. 60.8 has been completed each owner or operator...


Compliance provisions. (a) To determine compliance with Sec. 60.442 the owner or operator of the affected facility shall calculate a weighted average of the...


Performance test procedures. (a) The performance test for affected facilities complying with Sec. 60.442 without the use of add-on controls shall be identical to...


Monitoring of operations and recordkeeping. (a) The owner or operator of an affected facility subject to this subpart shall maintain a calendar month record of...


Test methods and procedures. (a) The VOC content per unit of coating solids applied and compliance with Sec. 60.422(a)(1) shall be determined by either Method...


Reporting requirements. (a) For all affected facilities subject to compliance with Sec. 60.442, the performance test data and results from the performance test...


Applicability and designation of affected facility. Source: 47 FR 47785, Oct. 27, 1982, unless otherwise noted. (a) The provisions of this subpart apply to each...


Definitions. (a) All terms used in this subpart not defined below are given the meaning in the Act or in subpart A of this part. Applied coating solids means...


Standard for volatile organic compounds. On or after the date on which the performance test required by Sec. 60.8 is completed, no owner or operator of an affected...


Performance test and compliance provisions. (a) Sections 60.8 (d) and (f) do not apply to the performance test procedures required by this subpart. (b) The owner...


Monitoring of emissions and operations. (a) The owner or operator of an affected facility that uses a capture system and an incinerator to comply with the emission...


Reporting and recordkeeping requirements. (a) The reporting requirements of Sec. 60.8(a) apply only to the initial performance test. Each owner or operator subject to...


Test methods and procedures. (a) The reference methods in Appendix A to this part, except as provided under Sec. 60.8(b), shall be used to determine compliance with...


Source: 47 FR 49612, Nov. 1, 1982, unless otherwise noted. (a) The provisions of this subpart apply to the following affected facilities in a metal coil...


in this subpart not defined below are given the same meaning as in the Act or in subpart A of this part. Coating means any organic material that is applied to the surface of...


(a) On and after the date on which Sec. 60.8 requires a performance test to be completed, each owner or operator subject to this subpart shall not cause to be discharged into...


(a) Section 60.8(d) and (f) do not apply to the performance test. (b) The owner or operator of an affected facility shall conduct an initial performance test as...


(a) Where compliance with the numerical limit specified in Sec. 60.462(a) (1) or (2) is achieved through the use of low VOC-content coatings without the use of emission...


(a) Where compliance with the numerical limit specified in Sec. 60.462(a) (1), (2), or (4) is achieved through the use of low VOC- content coatings without emission...


reference methods in appendix A to this part, except as provided under Sec. 60.8(b), shall be used to determine compliance with Sec. 60.462 as follows: (1) Method 24, or...


Applicability and designation of affected facilities. Source: 47 FR 34143, Aug. 6, 1982, unless otherwise noted. (a) The affected facilities to which this...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. Afterburner (A/B) means...


Standards for particulate matter. (a) On and after the date on which Sec. 60.8(b) requires a performance test to be completed, no owner or operator subject to...


Monitoring of operations. (a) The owner or operator subject to the provisions of this subpart, and using either an electrostatic precipitator or a high velocity air...


Test methods and procedures. (a) For saturators, the owner or operator shall conduct performance tests required in Sec. 60.8 as follows: (1) If the final product...


Applicability and designation of affected facility. Source: 48 FR 48335, Oct. 18, 1983, unless otherwise noted. (a)(1) The provisions of this...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act or in subpart A of part 60, and...


Industry Sec. 60.482-1 Standards: General. (a) Each owner or operator subject to the provisions of this subpart...


Sec. 60.482-2 Standards: Pumps in light liquid service. (a)(1) Each pump in light liquid service shall be monitored monthly...


Sec. 60.482-3 Standards: Compressors. (a) Each compressor shall be equipped with a seal system that includes a barrier fluid...


Sec. 60.482-4 Standards: Pressure relief devices in gas/vapor service. (a) Except during pressure releases, each pressure relief device...


Sec. 60.482-5 Standards: Sampling connection systems. (a) Each sampling connection system shall be equipped with a...


Industry Sec. 60.482-6 Standards: Open-ended valves or lines. (a)(1) Each open-ended valve or line shall be equipped with a...


Sec. 60.482-7 Standards: Valves in gas/vapor service and in light liquid service. (a) Each valve shall be monitored monthly to...


Sec. 60.482-8 Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service,...


Sec. 60.482-9 Standards: Delay of repair. (a) Delay of repair of equipment for which leaks have been detected will be allowed...


Sec. 60.482-10 Standards: Closed vent systems and control devices. (a) Owners or operators of closed vent systems and control...


Industry Sec. 60.483-1 Alternative standards for valves--allowable percentage of valves leaking. (a) An owner or operator may...


Sec. 60.483-2 Alternative standards for valves--skip period leak detection and repair. (a)(1) An owner or operator may elect to comply...


Equivalence of means of emission limitation. (a) Each owner or operator subject to the provisions of this subpart may apply to the Administrator...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods...


Recordkeeping requirements. (a)(1) Each owner or operator subject to the provisions of this subpart shall comply with the recordkeeping requirements of...


Reporting requirements. (a) Each owner or operator subject to the provisions of this subpart shall submit semiannual reports to the Administrator...


Reconstruction. For the purposes of this subpart: (a) The cost of the following frequently replaced components of the facility shall not be considered...


List of chemicals produced by affected facilities. The following chemicals are produced, as intermediates or final products, by process units covered...


Applicability and designation of affected facility. Source: 48 FR 38737, Aug. 25, 1983, unless otherwise noted. (a) The provisions of this subpart apply to the...


Definitions. (a) All terms which are used in this subpart and are not defined below are given the same meaning as in the Act and subpart A of this part. (1)...


Standards for volatile organic compounds. On or after the date on which the initial performance test required by Sec. 60.8(a) is completed, no owner or operator subject to...


Performance test and compliance provisions. (a) Section 60.8(d) does not apply to monthly performance tests and Sec. 60.8(f) does not apply to the performance test...


Monitoring of emissions and operations The owner or operator of an affected facility that uses a capture system and an incinerator to comply with the emission limits...


Reporting and recordkeeping requirements. (a) The owner or operator of an affected facility shall include the following data in the initial compliance report required...


Test methods and procedures. (a) The reference methods in appendix A to this part, except as provided in Sec. 60.8, shall be used to conduct performance tests. (1) Method...


Source: 48 FR 37590, Aug. 18, 1983, unless otherwise noted. [[Page 385]] (a) The affected facility to which the provisions of this subpart apply is...


are defined in the Clean Air Act, in Sec. 60.2 of this part, or in this section as follows: Bulk gasoline terminal means any gasoline facility which receives gasoline...


emissions from bulk gasoline terminals. On and after the date on which Sec. 60.8(a) requires a performance test to be completed, the owner or operator of each bulk...


(a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the test methods in appendix A of this part or other...


tank truck vapor tightness documentation required under Sec. 60.502(e)(1) shall be kept on file at the terminal in a permanent form available for inspection. (b) The...


this subpart: (a) The cost of the following frequently replaced components of the affected facility shall not be considered in calculating either the ``fixed capital cost of the...


Source: 53 FR 5873, Feb. 26, 1988, unless otherwise noted. (a) The affected facility to which the provisions of this subpart apply is each wood...


all terms not defined herein shall have the meaning given them in the Act and subpart A of this part. At retail means the sale by a commercial owner of a wood heater to...


Unless exempted under Sec. 60.530, each affected facility: (a) [Reserved] (b) Manufactured on or after July 1, 1990, or sold at retail on or after July 1, 1992,...


(a) For each model line, compliance with applicable emission limits may be determined based on testing of representative affected facilities within the model line. (b)...


Test methods and procedures in appendix A of this part, except as provided under Sec. 60.8(b), shall be used to determine compliance with the standards and requirements for...


(a)(1) A laboratory may apply for accreditation by the Administrator to conduct wood heater certification tests pursuant to Sec. 60.533. The application shall be in writing to:...


owner's manual. (a)(1) Each affected facility manufactured on or after July 1, 1988, or offered for sale at retail on or after July 1, 1990, shall have a permanent label affixed...


(a)(1) Each manufacturer who holds a certificate of compliance under Sec. 60.533(e) or (h) for a model line shall maintain records containing the information required by this paragraph...


operate an affected facility that does not have affixed to it a permanent label pursuant to Sec. 60.536 (b), (c), (e), (f)(2), (f)(3), or (g)(2). (b) No manufacturer...


(a)(1) In any case where the Administrator-- (i) Denies an application under Sec. 60.530(c) or Sec. 60.533(e), (ii) Issues a notice of revocation of certification under...


(a) In delegating implementation and enforcement authority to a State under section 111(c) of the Act, the authorities contained in paragraph (b) of this section shall be retained by...


The following provisions of subpart A of part 60 do not apply to this subpart: (a) Section 60.7, (b) Section 60.8(a), (c), (d), (e), and (f), and (c)...


Applicability and designation of affected facilities. Source: 52 FR 34874, Sept. 15, 1987, unless otherwise noted. (a) The provisions of this subpart, except as provided...


Definitions. (a) All terms that are used in this subpart and are not defined below are given the same meaning as in the Act and in subpart A of this part. Bead...


Standards for volatile organic compounds. (a) On and after the date on which the initial performance test, required by Sec. 60.8, is completed, but no later than 180 days...


Alternate standard for volatile organic compounds. (a) On and after the date on which the initial performance test, required by Sec. 60.8, is completed, but no later than 180...


Alternate standard for volatile organic compounds. (a) On and after the date on which the initial performance test, required by Sec. 60.8, is completed, but no later than 180...
...


Monitoring of operations. (a) Each owner or operator subject to the provisions of this subpart shall install, calibrate, maintain, and operate according to...


Recordkeeping requirements. (a) Each owner or operator of an affected facility that uses a thermal incinerator shall maintain continuous records of the temperature of the...


Reporting requirements. (a) Each owner or operator subject to the provisions of this subpart, at the time of notification of the anticipated initial startup of an...


Test methods and procedures. (a) The test methods in appendix A to this part, except as provided under Sec. 60.8(b), shall be used to determine compliance with Sec....


Delegation of authority. (a) In delegating implementation and enforcement authority to a State under section 111(c) of the Act, the authorities contained in paragraph (b) of...


Applicability and designation of affected facilities. Source: 55 FR 51035, Dec. 11, 1990, unless otherwise noted. (a) Affected facilities....


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act, in subpart A of part 60, or in subpart...


Manufacturing Industry Sec. 60.562-1 Standards: Process emissions. (a) Polypropylene, low density polyethylene, and high...


Sec. 60.562-2 Standards: Equipment leaks of VOC. (a) Each owner or operator of an affected facility subject to the provisions of...


Monitoring requirements. (a) Whenever a particular item of monitoring equipment is specified in this section to be installed, the owner or operator...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods...


Reporting and recordkeeping requirements. (a) Each owner or operator subject to the provisions of this subpart shall keep an up-to-date,...


Delegation of authority. (a) In delegating implementation and enforcement authority to a State under section 111(c) of the Act, the authority contained...


Applicability and designation of affected facility. Source: 49 FR 26892, June 29, 1984, unless otherwise noted. (a) The affected facility to which the provisions...


Definitions and symbols. (a) All terms used in this subpart, not defined below, are given the same meaning as in the Act or in subpart A of this part. ...


Standard for volatile organic compounds. (a) On and after the date on which the performance test required by Sec. 60.8 has been completed, each owner or operator subject...


Test methods and procedures. (a) Methods in appendix A of this part, except as provided under Sec. 60.8(b), shall be used to determine compliance with Sec. 60.582(a)...


Monitoring of operations and recordkeeping requirements. (a) The owner or operator of an affected facility controlled by a solvent recovery emission control device...


Reporting requirements. (a) For all affected facilities subject to compliance with Sec. 60.582, the performance test data and results from the performance test shall...


Applicability and designation of affected facility. Source: 49 FR 22606, May 30, 1984, unless otherwise noted. (a)(1) The provisions of this subpart apply to...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the act, in subpart A of part 60, or in subpart VV of part 60, and...


Standards. (a) Each owner or operator subject to the provisions of this subpart shall comply with the requirements of Secs. 60.482-1 to 60.482-10 as soon as...


Exceptions. (a) Each owner or operator subject to the provisions of this subpart may comply with the following exceptions to the provisions of subpart VV. ...


Applicability and designation of affected facility. Source: 49 FR 13651, Apr. 5, 1984, unless otherwise noted. (a) Except as provided in paragraph (b) of this...


Definitions. All terms that are used in this subpart and are not defined below are given the same meaning as in the Act and in subpart A of this part. Acrylic fiber...


Standard for volatile organic compounds. On and after the date on which the initial performance test required to be conducted by Sec. 60.8 is completed, no owner or operator...


Performance test and compliance provisions. (a) Section 60.8(f) does not apply to the performance test procedures required by this subpart. (b) Each owner or operator...


Reporting requirements. (a) The owner or operator of an affected facility shall submit a written report to the Administrator of the following: (1) The results of the...


Industry (SOCMI) Air Oxidation Unit Processes Sec. 60.610 Applicability and designation of affected facility. Source: 55 FR 26922, June 29,...


Industry (SOCMI) Air Oxidation Unit Processes Sec. 60.611 Definitions. As used in this subpart, all terms not defined here shall have the...


Industry (SOCMI) Air Oxidation Unit Processes Sec. 60.612 Standards. Each owner or operator of any affected facility shall comply with paragraph...


Industry (SOCMI) Air Oxidation Unit Processes Sec. 60.613 Monitoring of emissions and operations. (a) The owner or operator of an affected...


Industry (SOCMI) Air Oxidation Unit Processes Sec. 60.614 Test methods and procedures. (a) For the purpose of demonstrating compliance with...


Industry (SOCMI) Air Oxidation Unit Processes Sec. 60.615 Reporting and recordkeeping requirements. (a) Each owner or operator subject to Sec....


Industry (SOCMI) Air Oxidation Unit Processes Sec. 60.616 Reconstruction. For purposes of this subpart ``fixed capital cost of the new...


Industry (SOCMI) Air Oxidation Unit Processes Sec. 60.617 Chemicals affected by...


Industry (SOCMI) Air Oxidation Unit Processes Sec. 60.618 Delegation of authority. (a) In delegating implementation and enforcement authority to...


Source: 49 FR 37331, Sept. 21, 1984, unless otherwise noted. (a) The provisions of this subpart are applicable to the following affected facilities located at...


terms not defined herein shall have the same meaning given them in the Act and in subpart A of this part. Cartridge filter means a discrete filter unit containing both...


(a) Each affected petroleum solvent dry cleaning dryer that is installed at [[Page 477]] a petroleum dry cleaning plant after December 14, 1982, shall be a...


(a) Upon written application from any person, the Administrator may approve the use of equipment or procedures that have been demonstrated to his satisfaction to be equivalent, in terms...


or operator of an affected facility subject to the provisions of Sec. 60.622(a) shall perform an initial test to verify that the flow rate of recovered solvent from the solvent...


or operator of an affected facility subject to the provisions of this subpart shall maintain a record of the performance test required under Sec....


Applicability and designation of affected facility. Source: 50 FR 26124, June 24, 1985, unless otherwise noted. (a)(1) The provisions of this subpart apply...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act, in subpart A or subpart VV of part 60; and...


Standards. (a) Each owner or operator subject to the provisions of this subpart shall comply with the requirements of Secs. 60.482-1 (a), (b), and (d)...


Exceptions. (a) Each owner or operator subject to the provisions of this subpart may comply with the following exceptions to the provisions of subpart VV. ...


Alternative means of emission limitation. (a) If, in the Administrator's judgment, an alternative means of emission limitation will achieve a reduction in...


Recordkeeping requirements. (a) Each owner or operator subject to the provisions of this subpart shall comply with the requirements of paragraphs (b) and (c)...


Reporting requirements. (a) Each owner or operator subject to the provisions of this subpart shall comply with the requirements of paragraphs (b) and (c) of...


Applicability and designation of affected facilities. Source: 50 FR 40160, Oct. 1, 1985, unless otherwise noted. (a) The provisions of this subpart...


Definitions. All terms used in this subpart not defined below are given the meaning in the Act and in subpart A of this part. Acid gas means a...


Standards for sulfur dioxide. (a) During the initial performance test required by Sec. 60.8(b), each owner or operator shall achieve at a minimum,...


Compliance provisions. (a)(1) To determine compliance with the standards for sulfur dioxide specified in Sec. 60.642(a), during the initial performance...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods...


Monitoring of emissions and operations. (a) The owner or operator subject to the provisions of Sec. 60.642 (a) or (b) shall install, calibrate,...


Recordkeeping and reporting requirements. (a) Records of the calculations and measurements required in Sec. 60.642 (a) and (b) and Sec. 60.646 (a)...


Optional procedure for measuring hydrogen sulfide in acid...


(SOCMI) Distillation Operations Sec. 60.660 Applicability and designation of affected facility. Source: 55 FR 26942, June 29, 1990,...


(SOCMI) Distillation Operations Sec. 60.661 Definitions. As used in this subpart, all terms not defined here shall have the...


(SOCMI) Distillation Operations Sec. 60.662 Standards. Each owner or operator of any affected facility shall comply with paragraph (a),...


(SOCMI) Distillation Operations Sec. 60.663 Monitoring of emissions and operations. (a) The owner or operator of an affected facility...


(SOCMI) Distillation Operations Sec. 60.664 Test methods and procedures. (a) For the purpose of demonstrating compliance with Sec....


(SOCMI) Distillation Operations Sec. 60.665 Reporting and recordkeeping requirements. (a) Each owner or operator subject to Sec....


(SOCMI) Distillation Operations Sec. 60.666 Reconstruction. For purposes of this subpart ``fixed capital cost of the new...


(SOCMI) Distillation Operations Sec. 60.667 Chemicals affected by...


(SOCMI) Distillation Operations Sec. 60.668 Delegation of authority. (a) In delegating implementation and enforcement authority to a...


Applicability and designation of affected facility. Source: 51 FR 31337, Aug. 1, 1985, unless otherwise noted. (a)(1) Except as provided in paragraphs (a)(2), (b),...


Definitions. All terms used in this subpart, but not specifically defined in this section, shall have the meaning given them in the Act and in subpart A of...


Standard for particulate matter. (a) On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject...


Reconstruction. (a) The cost of replacement of ore-contact surfaces on processing equipment shall not be considered in calculating either the ``fixed capital cost of the...


Monitoring of operations. The owner or operator of any affected facility subject to the provisions of this subpart which uses a wet scrubber to control emissions...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the...


Reporting and recordkeeping. (a) Each owner or operator seeking to comply with Sec. 60.670(d) shall submit to the Administrator the following information about the...


Applicability and designation of affected facility. Source: 50 FR 7699, Feb. 25, 1985, unless otherwise noted. (a) The affected facility to which the provisions...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act and in subpart A of this part. Glass pull rate...


Standard for particulate matter. On and after the date on which the performance test required to be conducted by Sec. 60.8 is completed, no owner or operator subject to...


Monitoring of operations. (a) An owner or operator subject to the provisions of this subpart who uses a wet scrubbing control device to comply with the mass...


Recordkeeping and reporting requirements. (a) At 30-minute intervals during each 2-hour test run of each performance test of a wet scrubber control device and at...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use as reference methods and procedures the...


Applicability and designation of affected facility. Source: 53 FR 47623, Nov. 23, 1988, unless otherwise noted. (a)(1) The provisions of this subpart apply...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act or in subpart A of 40 CFR part 60, and...


Sec. 60.692-1 Standards: General. (a) Each owner or operator subject to the provisions of this subpart shall comply with...


60.692-2 Standards: Individual drain systems. (a)(1) Each drain shall be equipped with water seal controls. (2)...


60.692-3 Standards: Oil-water separators. (a) Each oil-water separator tank, slop oil tank, storage vessel, or other auxiliary...


60.692-4 Standards: Aggregate facility. A new, modified, or reconstructed aggregate facility shall comply with the requirements of...


60.692-5 Standards: Closed vent systems and control devices. (a) Enclosed combustion devices shall be designed and operated to reduce...


Sec. 60.692-6 Standards: Delay of repair. (a) Delay of repair of facilities that are subject to the provisions of this...


60.692-7 Standards: Delay of compliance. (a) Delay of compliance of modified individual drain systems with ancillary downstream...


Wastewater Systems Sec. 60.693-1 Alternative standards for individual drain systems. (a) An owner or operator may elect to construct and operate...


60.693-2 Alternative standards for oil-water separators. (a) An owner or operator may elect to construct and operate a floating roof...


Permission to use alternative means of emission limitation. (a) If, in the Administrator's judgment, an alternative means of emission limitation will achieve a...


Monitoring of operations. (a) Each owner or operator subject to the provisions of this subpart shall install, calibrate, maintain, and operate according...


Performance test methods and procedures and compliance provisions. (a) Before using any equipment installed in compliance with the requirements of Sec....


Recordkeeping requirements. (a) Each owner or operator of a facility subject to the provisions of this subpart shall comply with the recordkeeping requirements...


Reporting requirements. (a) An owner or operator electing to comply with the provisions of Sec. 60.693 shall notify the Administrator of the alternative...


Delegation of authority. (a) In delegating implementation and enforcement authority to a State under section 111(c) of the Act, the authorities contained in...


Reactor Processes Sec. 60.700 Applicability and designation of affected facility. Source: 58 FR 45962, Aug. 31, 1993,...


Reactor Processes Sec. 60.701 Definitions. As used in this subpart, all terms not defined here shall have the meaning given...


Reactor Processes Sec. 60.702 Standards. Each owner or operator of any affected facility shall comply with paragraph (a), (b),...


Reactor Processes Sec. 60.703 Monitoring of emissions and operations. (a) The owner or operator of an affected facility that...


Reactor Processes Sec. 60.704 Test methods and procedures. (a) For the purpose of demonstrating compliance with Sec. 60.702,...


Reactor Processes Sec. 60.705 Reporting and recordkeeping requirements. (a) Each owner or operator subject to Sec. 60.702...


Reactor Processes Sec. 60.706 Reconstruction. (a) For purposes of this subpart ``fixed capital cost of the new components,'' as...


Reactor Processes Sec. 60.707 Chemicals affected by...


Reactor Processes Sec. 60.708 Delegation of authority. (a) In delegating implementation and enforcement authority to a...


Applicability and designation of affected facility. Source: 53 FR 38914, Oct. 3, 1988, unless otherwise noted. (a) The affected facilities to which the provisions of...


Definitions, symbols, and cross reference tables. (a) All terms used in this subpart that are not defined below have the meaning given to them in the Act and in subpart A of...


Standards for volatile organic compounds. Each owner or operator of any affected facility that is subject to the requirements of this subpart shall comply with the...


Compliance provisions. (a) Applicability of Sec. 60.712(b)(1) and (2) (standards for modified or reconstructed coating operations) and determination of control level required...


Installation of monitoring devices and recordkeeping. All monitoring devices required under the provisions of this section shall be installed and calibrated, according to...


Test methods and procedures. Methods in appendix A of this part, except as provided under Sec. 60.8(b), shall be used to determine compliance as follows: (a) Method 24...


Permission to use alternative means of emission limitation. (a) If, in the Administrator's judgment, an alternative means of emission limitation will achieve a reduction in...


Reporting and monitoring requirements. (a) For all affected coating operations subject to Sec. 60.712(a), (b)(1), (b)(2), or (b)(3) and all affected coating mix...


Delegation of authority. (a) In delegating implementation and enforcement authority to a State under section 111(c) of the Act, the authorities contained in paragraph (b) of...


Applicability and designation of affected facility. Source: 53 FR 2676, Jan. 29, 1988, unless otherwise noted. [[Page 560]] (a)...


Definitions. (a) As used in this subpart, all terms not defined herein shall have the meaning given them in the Act or in subpart A of this part. ...


Standards for volatile organic compounds. (a) Each owner or operator of any affected facility which is subject to the requirements of this subpart shall...


Performance tests and compliance provisions. (a) Section 60.8 (d) and (f) do not apply to the performance test procedures required by this section. ...


Reporting and recordkeeping requirements. (a) The reporting requirements of Sec. 60.8(a) apply only to the initial performance test. Each owner or...


Test methods and procedures. (a) The reference methods in appendix A to this part except as provided under Sec. 60.8(b) shall be used to determine...


Delegation of authority. (a) In delegating implementation and enforcement authority to a State under section 111(c) of the Act, the authorities contained...


Applicability and designation of affected facility. Source: 57 FR 44503, Sept. 28, 1992, unless otherwise noted. (a) The affected facility to which the provisions of...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Clean Air Act and in subpart A of this part. Calciner...


Standards for particulate matter. Each owner or operator of any affected facility that is subject to the requirements of this subpart shall comply with the emission...


Reconstruction. The cost of replacement of equipment subject to high temperatures and abrasion on processing equipment shall not be considered in calculating either the...


Monitoring of emissions and operations. (a) With the exception of the process units described in paragraphs (b), (c), and (d) of this section, the owner or operator of...


Recordkeeping and reporting requirements. (a) Records of the measurements required in Sec. 60.734 of this subpart shall be retained for at least 2 years. (b) Each owner...


Test methods and procedures. (a) In conducting the performance tests required in Sec. 60.8, the owner or operator shall use the test methods in appendix A of this part or...


Delegation of authority. (a) In delegating implementation and enforcement authority to a State under section 111(c) of the Act, the authorities contained in paragraph (b)...


Applicability and designation of affected facility. Source: 54 FR 37551, Sept. 11, 1989, unless otherwise noted. (a) The affected facility to which the...


Definitions, symbols, and cross-reference tables. (a) All terms used in this subpart not defined below have the meaning given to them in the Act and in subpart A of...


Standards for volatile organic compounds. (a) Each owner or operator of an affected facility that is subject to the requirements of this subpart shall comply with...


Compliance provisions. (a) To demonstrate compliance with the emission reduction standard for coating operations specified in Sec. 60.742(b)(1), the owner or...


Monitoring requirements. (a) Each owner or operator of an affected facility shall install and calibrate all monitoring devices required under the provisions of...


Test methods and procedures. Methods in appendix A of this part, except as provided under Sec. 60.8(b), shall be used to determine compliance as follows: ...


Permission to use alternative means of emission limitation. (a) If, in the Administrator's judgment, an alternative means of emission limitation will achieve a reduction...


Reporting and recordkeeping requirements. (a) For each affected facility subject to the requirements of Sec. 60.742(b) and (c), the owner or operator shall submit...


Delegation of authority. (a) In delegating implementation and enforcement authority to a State under section 111(c) of the Act, the authorities contained in paragraph...


Applicability, designation of affected facility, and delegation of authority. Source: 61 FR 9919, Mar. 12, 1996, unless otherwise noted. (a) The provisions of this...


Definitions. As used in this subpart, all terms not defined herein shall have the meaning given them in the Act or in subpart A of this part. Active collection system means...


Standards for air emissions from municipal solid waste landfills. (a) Each owner or operator of an MSW landfill having a design capacity less than 2.5 million megagrams by mass...


Operational standards for collection and control systems. Each owner or operator of an MSW landfill with a gas collection and control system used to comply with the provisions...


Test methods and procedures. (a)(1) The landfill owner or operator shall calculate the NMOC emission rate using either the equation provided in paragraph (a)(1)(i) of...


Compliance provisions. (a) Except as provided in Sec. 60.752(b)(2)(i)(B), the specified methods in paragraphs (a)(1) through (a)(6) of this section shall be used to...


Monitoring of operations. Except as provided in Sec. 60.752(b)(2)(i)(B), (a) Each owner or operator seeking to comply with Sec. 60.752(b)(2)(ii)(A) for an active...


Reporting requirements. Except as provided in Sec. 60.752(b)(2)(i)(B), (a) Each owner or operator subject to the requirements of this subpart shall submit an initial...


Recordkeeping requirements. (a) Except as provided in Sec. 60.752(b)(2)(i)(B), each owner or operator of an MSW landfill subject to the provisions of Sec. 60.752(b) shall...


Specifications for active collection systems. (a) Each owner or operator seeking to comply with Sec. 60.752(b)(2)(i) shall site active collection wells, horizontal...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1000 What does this subpart do? ...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1005 When does this subpart...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1010 Does this subpart apply to my...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1015 What is a new municipal waste...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1020 Does this subpart allow...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1025 Do subpart E new source...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1030 Can the Administrator delegate authority...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1035 How are these new source...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1040 Do all five components of these new...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1045 Are there different subcategories...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1050 Who must submit a materials...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1055 What is a materials separation plan? ...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1060 What steps must I complete for my...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1065 What must I include in my...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1070 How do I make my draft materials...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1075 When must I accept comments on the...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1080 Where and when must I hold a public...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1085 What must I do with any public...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1090 What must I do with my revised...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1095 What must I include in the public meeting...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1100 What must I do with any public comments...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1105 How do I submit my final...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1110 Who must submit a siting analysis? ...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1115 What is a siting analysis? ...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1120 What steps must I complete for my...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1125 What must I include in my...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1130 How do I make my siting analysis...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1135 When must I accept comments on the...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1140 Where and when must I hold a public...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1145 What must I do with any public...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1150 How do I submit my siting analysis? ...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1155 What types of training must I do? ...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1160 Who must complete the operator...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1165 Who must complete the...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1170 What plant-specific training must...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1175 What information must I include in...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1180 Where must I keep the...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1185 What types of operator certification...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1190 After the required date for...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1195 What if all the certified operators...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1200 What are the operating practice...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1205 What happens to the operating...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1210 What pollutants are regulated by...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1215 What emission limits must I meet?...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1220 What happens to the emission limits...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1225 What types of continuous emission...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1230 What continuous emission...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1235 How are the data from the...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1240 How do I make sure my continuous...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1245 Am I exempt from any appendix B or...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1250 What is my schedule for...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1255 What must I do if I choose to...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1260 What is the minimum amount of...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1265 How do I convert my 1-hour...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1270 What is required for my...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1275 What additional requirements must I meet...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1280 What must I do if any of my...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1285 What types of stack tests must...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1290 How are the stack test data used? ...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1295 What schedule must I follow for the...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1300 What test methods must I use to...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1305 May I conduct stack testing...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1310 May I deviate from the 13-month...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1315 Must I meet other requirements...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1320 How do I monitor the load of...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1325 How do I monitor the temperature of...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1330 How do I monitor the injection rate...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1335 What is the minimum amount of...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1340 What records must I keep? You...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1345 Where must I keep my records and for...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1350 What records must I keep for the...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1355 What records must I keep for...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1360 What records must I keep for...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1365 What records must I keep...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1370 What records must I keep for...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1375 What reports must I submit before I...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1380 What must I include in my notice...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1385 What reports must I submit after I submit...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1390 What are the appropriate units...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1395 When must I submit the initial...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1400 What must I include in my...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1405 When must I submit the annual report? ...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1410 What must I include in my...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1415 What must I do if I am out of...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1420 If a semiannual report is required,...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1425 What must I include in the...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1430 Can reporting dates be changed? ...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1435 What is an air curtain incinerator? ...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1440 What is yard waste? Yard waste...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1445 What are the emission limits for...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1450 How must I monitor opacity for air...


for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1455 What are the recordkeeping and...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1460 What equations must I use? ...


or for Which Modification or Reconstruction is Commenced After June 6, 2001 Sec. 60.1460 What equations must I use? ...
...


1999 Sec. 60.1500 What is the purpose of this subpart? Source: 65 FR 76384, Dec. 6, 2000, unless otherwise noted. ...


1999 Sec. 60.1505 Am I affected by this subpart? (a) If you are the Administrator of an air quality program in a State or...


1999 Sec. 60.1510 Is a State plan required for all States? No, you are not required to submit a State plan if there are...


1999 Sec. 60.1515 What must I include in my State plan? (a) Include nine items: (1) Inventory of affected municipal...


1999 Sec. 60.1520 Is there an approval process for my State plan? The EPA will review your State plan according to...


1999 Sec. 60.1525 What if my State plan is not approvable? If you do not submit an approvable State plan (or a...


1999 Sec. 60.1530 Is there an approval process for a negative declaration letter? No, the EPA has no formal review process...


1999 Sec. 60.1535 What compliance schedule must I include in my State plan? (a) Your State plan must include compliance...


1999 Sec. 60.1540 Are there any State plan requirements for this subpart that supersede the requirements specified in subpart B? ...


1999 Sec. 60.1545 Does this subpart directly affect municipal waste combustion unit owners and operators in my State? (a)...


1999 Sec. 60.1550 What municipal waste combustion units must I address in my State plan? (a) Your State plan must address...


1999 Sec. 60.1555 Are any small municipal waste combustion units exempt from my State plan? (a) Small municipal...


1999 Sec. 60.1560 Can an affected municipal waste combustion unit reduce its capacity to less than 35 tons per day rather than comply...


1999 Sec. 60.1565 What subcategories of small municipal waste combustion units must I include in my State plan? This...


1999 Sec. 60.1570 What is the ``model rule'' in this subpart? (a) The model rule is the portion of the emission...


1999 Sec. 60.1575 How does the model rule relate to the required elements of my State plan? The model rule may be used to...


1999 Sec. 60.1580 What are the principal components of the model rule? The model rule contains five major components: ...


1999 Sec. 60.1585 What are my requirements for meeting increments of progress and achieving final compliance? (a) Class I units....


1999 Sec. 60.1590 When must I complete each increment of progress? Table 1 of this subpart specifies compliance dates for each...


1999 Sec. 60.1595 What must I include in the notifications of achievement of my increments of progress? Your notification...


1999 Sec. 60.1600 When must I submit the notifications of achievement of increments of progress? Notifications of the...


1999 Sec. 60.1605 What if I do not meet an increment of progress? If you fail to meet an increment of progress, you must submit...


1999 Sec. 60.1610 How do I comply with the increment of progress for submittal of a control plan? For your control plan...


1999 Sec. 60.1615 How do I comply with the increment of progress for awarding contracts? You must submit a signed copy of...


1999 Sec. 60.1620 How do I comply with the increment of progress for initiating onsite construction? You must initiate...


1999 Sec. 60.1625 How do I comply with the increment of progress for completing onsite construction? You must complete...


1999 Sec. 60.1630 How do I comply with the increment of progress for achieving final compliance? For the final compliance...


1999 Sec. 60.1635 What must I do if I close my municipal waste combustion unit and then restart my municipal waste combustion unit? ...


1999 Sec. 60.1640 What must I do if I plan to permanently close my municipal waste combustion unit and not restart it? (a) If...


1999 Sec. 60.1645 What types of training must I do? There are two types of required training: (a) Training of operators...


1999 Sec. 60.1650 Who must complete the operator training course? By when? (a) Three types of employees must complete the EPA...


1999 Sec. 60.1655 Who must complete the plant-specific training course? All employees with responsibilities that affect how...


1999 Sec. 60.1660 What plant-specific training must I provide? For plant-specific training, you must do four things: (a)...


1999 Sec. 60.1665 What information must I include in the plant-specific operating manual? You must include 11 items in...


1999 Sec. 60.1670 Where must I keep the plant-specific operating manual? You must keep your operating manual in an...


1999 Sec. 60.1675 What types of operator certification must the chief facility operator and shift supervisor obtain and by when must...


1999 Sec. 60.1680 After the required date for operator certification, who may operate the municipal waste combustion unit? ...


1999 Sec. 60.1685 What if all the certified operators must be temporarily offsite? If the certified chief facility operator...


1999 Sec. 60.1690 What are the operating practice requirements for my municipal waste combustion unit? (a) You must not...


1999 Sec. 60.1695 What happens to the operating requirements during periods of startup, shutdown, and malfunction? (a)...


1999 Sec. 60.1700 What pollutants are regulated by this subpart? Eleven pollutants, in four groupings, are regulated: ...


1999 Sec. 60.1705 What emission limits must I meet? By when? (a) After the date the initial stack test and continuous...


1999 Sec. 60.1710 What happens to the emission limits during periods of startup, shutdown, and malfunction? (a) The...


1999 Sec. 60.1715 What types of continuous emission monitoring must I perform? To continuously monitor emissions, you must...


1999 Sec. 60.1720 What continuous emission monitoring systems must I install for gaseous pollutants? (a) You must...


1999 Sec. 60.1725 How are the data from the continuous emission monitoring systems used? You must use data from the...


1999 Sec. 60.1730 How do I make sure my continuous emission monitoring systems are operating correctly? (a) Conduct...


1999 Sec. 60.1735 Am I exempt from any appendix B or appendix F requirements to evaluate continuous emission monitoring systems? ...


1999 Sec. 60.1740 What is my schedule for evaluating continuous emission monitoring systems? (a) Conduct annual evaluations of...


1999 Sec. 60.1745 What must I do if I choose to monitor carbon dioxide instead of oxygen as a diluent gas? You must establish...


1999 Sec. 60.1750 What is the minimum amount of monitoring data I must collect with my continuous emission monitoring systems and is...


1999 Sec. 60.1755 How do I convert my 1-hour arithmetic averages into appropriate averaging times and units? (a) Use the...


1999 Sec. 60.1760 What is required for my continuous opacity monitoring system and how are the data used? (a) Install,...


1999 Sec. 60.1765 What additional requirements must I meet for the operation of my continuous emission monitoring systems and...


1999 Sec. 60.1770 What must I do if any of my continuous emission monitoring systems are temporarily unavailable to meet the data...


1999 Sec. 60.1775 What types of stack tests must I conduct? Conduct initial and annual stack tests to measure the...


1999 Sec. 60.1780 How are the stack test data used? You must use results of stack tests for dioxins/furans, cadmium,...


1999 Sec. 60.1785 What schedule must I follow for the stack testing? (a) Conduct initial stack tests for the pollutants listed...


1999 Sec. 60.1790 What test methods must I use to stack test? (a) Follow Table 8 of this subpart to establish the...


1999 Sec. 60.1795 May I conduct stack testing less often? (a) You may test less often if you own or operate a Class...


1999 Sec. 60.1800 May I deviate from the 13-month testing schedule if unforeseen circumstances arise? You may not deviate from...


1999 Sec. 60.1805 Must I meet other requirements for continuous monitoring? You must also monitor three operating parameters: ...


1999 Sec. 60.1810 How do I monitor the load of my municipal waste combustion unit? (a) If your municipal waste combustion...


1999 Sec. 60.1815 How do I monitor the temperature of flue gases at the inlet of my particulate matter control device? You...


1999 Sec. 60.1820 How do I monitor the injection rate of activated carbon? If your municipal waste combustion unit...


1999 Sec. 60.1825 What is the minimum amount of monitoring data I must collect with my continuous parameter monitoring systems and is...


1999 Sec. 60.1830 What records must I keep? You must keep four types of records: (a) Operator training and certification. ...


1999 Sec. 60.1835 Where must I keep my records and for how long? (a) Keep all records onsite in paper copy or electronic...


1999 Sec. 60.1840 What records must I keep for operator training and certification? You must keep records of six items: ...


1999 Sec. 60.1845 What records must I keep for stack tests? For stack tests required under Sec. 60.1775, you must keep...


1999 Sec. 60.1850 What records must I keep for continuously monitored pollutants or parameters? You must keep records of...


1999 Sec. 60.1855 What records must I keep for municipal waste combustion units that use activated carbon? For municipal...


1999 Sec. 60.1860 What reports must I submit and in what form? (a) Submit an initial report and annual reports, plus...


1999 Sec. 60.1865 What are the appropriate units of measurement for reporting my data? See Tables 2, 3, 4 and 5 of this subpart...


1999 Sec. 60.1870 When must I submit the initial report? As specified in Sec. 60.7(c), submit your initial report by 180...


1999 Sec. 60.1875 What must I include in my initial report? You must include seven items: (a) The emission...


1999 Sec. 60.1880 When must I submit the annual report? Submit the annual report no later than February 1 of each year...


1999 Sec. 60.1885 What must I include in my annual report? Summarize data collected for all pollutants and parameters...


1999 Sec. 60.1890 What must I do if I am out of compliance with the requirements of this subpart? You must submit a...


1999 Sec. 60.1895 If a semiannual report is required, when must I submit it? (a) For data collected during the first half of...


1999 Sec. 60.1900 What must I include in the semiannual out-of-compliance reports? You must include three items in...


1999 Sec. 60.1905 Can reporting dates be changed? (a) If the Administrator agrees, you may change the semiannual or...


1999 Sec. 60.1910 What is an air curtain incinerator? An air curtain incinerator operates by forcefully projecting a curtain...


1999 Sec. 60.1915 What is yard waste? Yard waste is grass, grass clippings, bushes, shrubs, and clippings from bushes...


1999 Sec. 60.1920 What are the emission limits for air curtain incinerators that burn 100 percent yard waste? If your air...


1999 Sec. 60.1925 How must I monitor opacity for air curtain incinerators that burn 100 percent yard waste? (a) Use EPA...


1999 Sec. 60.1930 What are the recordkeeping and reporting requirements for air curtain incinerators that burn 100 percent yard...


1999 Sec. 60.1935 What equations must I use? (a) Concentration correction to 7 percent oxygen. Correct any...


1999 Sec. 60.1935 What equations must I use? (a) Concentration correction to 7 percent oxygen. Correct any...
...


Incineration Units for Which Construction Is Commenced After November 30, 1999 or for Which Modification or Reconstruction Is Commenced on or After June...


This subpart takes effect on June 1, 2001. Some of the requirements in this subpart apply to planning the CISWI unit and must be completed even before construction is initiated...


Yes, if your incineration unit meets all the requirements specified in paragraphs (a) through (c) of this section. (a) Your incineration unit is a new incineration...


(a) A new incineration unit is an incineration unit that meets either of the two criteria specified in paragraph (a)(1) or (2) of this section. (1) Commenced construction...


this subpart? This subpart exempts fifteen types of units described in paragraphs (a) through (o) of this section. (a) Pathological waste incineration units. Incineration...


not listed in Sec. 60.2020(n)? (a) If your chemical recovery unit is not listed in Sec. 60.2020(n), you can petition the Administrator to add your unit to the list. The...


(a) This subpart can be implemented and enforced by the U.S. Environmental Protection Agency (EPA), or a delegated authority such as your State, local, or tribal agency. If...


structured? These new source performance standards contain the eleven major components listed in paragraphs (a) through (k) of this section. (a) Preconstruction...


performance standards apply at the same time? No. You must meet the preconstruction siting analysis and waste management plan requirements before you commence construction of...


(a) You must prepare a siting analysis if you plan to commence construction of a CISWI unit after December 1, 2000. (b) You must prepare a siting analysis if you are required...


(a) The siting analysis must consider air pollution control alternatives that minimize, on a site-specific basis, to [[Page 667]] the maximum extent practicable, potential risks...


A waste management plan is a written plan that identifies both the feasibility and the methods used to reduce or separate certain components of solid waste from the waste stream in...


[Code of Federal Regulations] [Title 40, Volume 6] [Revised as of July 1, 2001] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR60.2060] [Page 667] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES--Table of Contents Subpart CCCC--Standards of Performance for Commercial and Industrial Sec. 60.2060 When must I submit my waste management plan? You must submit a waste management plan prior to commencing construction. ...


A waste management plan must include consideration of the reduction or separation of waste-stream elements such as paper, cardboard, plastics, glass, batteries,...


requirements? (a) No CISWI unit can be operated unless a fully trained and qualified CISWI unit operator is accessible, either at the facility or can be at the...


completed? The operator training course must be completed by the later of the three dates specified in paragraphs (a) through (c) of this section. (a) Six months after...


(a) You must obtain operator qualification by completing a training course that satisfies the criteria under Sec. 60.2070(b). (b) Qualification is valid from the date on...


To maintain qualification, you must complete an annual review or refresher course covering, at a minimum, the five topics described in paragraphs (a) through (e) of...


You must renew a lapsed operator qualification by one of the two methods specified in paragraphs (a) and (b) of this section. (a) For a lapse of less than 3 years,...


required? (a) Documentation must be available at the facility and readily accessible for all CISWI unit operators that addresses the ten topics described in paragraphs...


not accessible? If all qualified operators are temporarily not accessible (i.e., not at the facility and not able to be at the facility within 1 hour), you must meet...


by when? You must meet the emission limitations specified in Table 1 of this subpart 60 days after your CISWI unit reaches the charge rate at which it will operate, but no...


by when? (a) If you use a wet scrubber to comply with the emission limitations, you must establish operating limits for four operating parameters (as specified in Table 2 of...


with the emission limitations? If you use an air pollution control device other than a wet scrubber, or limit emissions in some other manner, to comply with the...


and malfunction? (a) The emission limitations and operating limits apply at all times except during CISWI unit startups, shutdowns, or malfunctions. (b)...


test? (a) All performance tests must consist of a minimum of three test runs conducted under conditions representative of normal operations. (b) You must...


You use results of performance tests to demonstrate compliance with the emission limitations in Table 1 of this subpart. Initial...


the emission limitations and establish the operating limits? You must conduct an initial performance test, as required under Sec. 60.8, to determine compliance with the...


test? The initial performance test must be conducted within 60 days after your CISWI unit reaches the charge rate at which it will operate, but no later than 180...


the emission limitations and the operating limits? (a) You must conduct an annual performance test for particulate matter, hydrogen chloride, and opacity for each...


test? You must conduct annual performance tests for particulate matter, hydrogen chloride, and opacity within 12 months following the initial performance test....


(a) You can test less often for a given pollutant if you have test data for at least 3 years, and all performance tests for the pollutant (particulate matter,...


establish new operating limits? (a) Yes. You may conduct a repeat performance test at any time to establish new values for the operating limits. The Administrator may request...


and what parameters must I monitor? (a) If you are using a wet scrubber to comply with the emission limitation under Sec. 60.2105, you must install, calibrate...


I must obtain? (a) Except for monitor malfunctions, associated repairs, and required quality assurance or quality control activities (including, as applicable,...


You must maintain the fourteen items (as applicable) as specified in paragraphs (a) through (n) of this section for a period of at least 5 years: (a) Calendar date of each record. ...


records? All records must be available onsite in either paper copy or computer-readable format that can be printed upon request, unless an alternative format is approved by...


[Code of Federal Regulations] [Title 40, Volume 6] [Revised as of July 1, 2001] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR60.2185] [Page 674] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES--Table of Contents Subpart CCCC--Standards of Performance for Commercial and Industrial Sec. 60.2185 What reports must I submit? See Table 4 of this subpart for a summary of the reporting requirements. ...


You must submit a notification prior to commencing construction that includes the five items listed in paragraphs (a) through (e) of this section. (a) A...


initial startup? You must submit the information specified in paragraphs (a) through (e) of this section prior to initial startup. (a) The type(s) of waste to be burned. ...


initial performance test? You must submit the information specified in paragraphs (a) through (c) of this section no later than 60 days following the initial performance...


You must submit an annual report no later than 12 months following the submission of the information in Sec. 60.2200. You must submit subsequent reports no more than 12...


report? The annual report required under Sec. 60.2205 must include the ten items listed in paragraphs (a) through (j) of this section. If you have a deviation from...


the operating limits or the emission limitations? (a) You must submit a deviation report if any recorded 3-hour average parameter level is above the maximum operating...


In each report required under Sec. 60.2215, for any pollutant or parameter that deviated from the emission limitations or operating limits specified in this...


the requirement to have a qualified operator accessible? (a) If all qualified operators are not accessible for 2 weeks or more, you must take the two actions in...


[Code of Federal Regulations] [Title 40, Volume 6] [Revised as of July 1, 2001] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR60.2230] [Page 676] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES--Table of Contents Subpart CCCC--Standards of Performance for Commercial and Industrial Sec. 60.2230 Are there any other notifications or reports that I must submit? Yes. You must submit notifications as provided by Sec. 60.7. ...


[Code of Federal Regulations] [Title 40, Volume 6] [Revised as of July 1, 2001] From the U.S. Government Printing Office via GPO Access [CITE: 40CFR60.2235] [Page 676] TITLE 40--PROTECTION OF ENVIRONMENT CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY PART 60--STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES--Table of Contents Subpart CCCC--Standards of Performance for Commercial and Industrial Sec. 60.2235 In what form can I submit my reports? Submit initial, annual, and deviation reports electronically or in paper format, postmarked on or before the submittal due dates. ...


If the Administrator agrees, you may change the semiannual or annual reporting dates. See Sec. 60.19(c) for procedures to seek approval to change your reporting date. ...


title V operating permit for my unit? Yes. Each CISWI unit must operate pursuant to a permit issued under section 129(e) and title V of the Clean Air Act by the later of the...


(a) An air curtain incinerator operates by forcefully projecting a curtain of air across an open chamber or open pit in which combustion occurs. Incinerators of this type can...


curtain incinerators? (a) Within 60 days after your air curtain incinerator reaches the charge rate at which it will operate, but no later than 180 days after its initial...


(a) Use Method 9 of appendix A of this part to determine compliance with the opacity limitation. (b) Conduct an initial test for opacity as specified in...


for air curtain incinerators? (a) Prior to commencing construction on your air curtain incinerator, submit the three items described in paragraphs (a)(1) through...


for air curtain incinerators? (a) Prior to commencing construction on your air curtain incinerator, submit the three items described in paragraphs (a)(1) through...
...


Construction On or Before November 30, 1999 Sec. 60.2500 What is the purpose of this subpart? Source: 65 FR 75362, Dec. 1, 2000, unless...


Construction On or Before November 30, 1999 Sec. 60.2505 Am I affected by this subpart? (a) If you are the Administrator of an air quality program in...


Construction On or Before November 30, 1999 Sec. 60.2510 Is a State plan required for all States? No. You are not required to submit a State plan...


Construction On or Before November 30, 1999 Sec. 60.2515 What must I include in my State plan? (a) You must include the nine items described...


Construction On or Before November 30, 1999 Sec. 60.2520 Is there an approval process for my State plan? Yes. The EPA will review your State...


Construction On or Before November 30, 1999 Sec. 60.2525 What if my State plan is not approvable? If you do not submit an approvable State plan...


Construction On or Before November 30, 1999 Sec. 60.2530 Is there an approval process for a negative declaration letter? No. The EPA has no...


Construction On or Before November 30, 1999 Sec. 60.2535 What compliance schedule must I include in my State plan? (a) Your State plan must...


Construction On or Before November 30, 1999 Sec. 60.2540 Are there any State plan requirements for this subpart that apply instead of the requirements...


Construction On or Before November 30, 1999 Sec. 60.2545 Does this subpart directly affect CISWI unit owners and operators in my State? (a) No....


Construction On or Before November 30, 1999 Sec. 60.2550 What CISWI units must I address in my State plan? (a) Your State plan must...


Construction On or Before November 30, 1999 Sec. 60.2555 What combustion units are exempt from my State plan? This subpart exempts fifteen types...


Construction On or Before November 30, 1999 Sec. 60.2558 What if a chemical recovery unit is not listed in Sec. 60.2555(n)? (a) If a...


Construction On or Before November 30, 1999 Sec. 60.2560 What is the ``model rule'' in this subpart? (a) The model rule is the portion of...


Construction On or Before November 30, 1999 Sec. 60.2565 How does the model rule relate to the required elements of my State plan? Use the model...


Construction On or Before November 30, 1999 Sec. 60.2570 What are the principal components of the model rule? The model rule contains the eleven...


Construction On or Before November 30, 1999 Sec. 60.2575 What are my requirements for meeting increments of progress and achieving final compliance? ...


Construction On or Before November 30, 1999 Sec. 60.2580 When must I complete each increment of progress? Table 1 of this subpart specifies...


Construction On or Before November 30, 1999 Sec. 60.2585 What must I include in the notifications of achievement of increments of progress? ...


Construction On or Before November 30, 1999 Sec. 60.2590 When must I submit the notifications of achievement of increments of progress? ...


Construction On or Before November 30, 1999 Sec. 60.2595 What if I do not meet an increment of progress? If you fail to meet an increment of...


Construction On or Before November 30, 1999 Sec. 60.2600 How do I comply with the increment of progress for submittal of a control plan? For...


Construction On or Before November 30, 1999 Sec. 60.2605 How do I comply with the increment of progress for achieving final compliance? For the...


Construction On or Before November 30, 1999 Sec. 60.2610 What must I do if I close my CISWI unit and then restart it? (a) If you close your CISWI...


Construction On or Before November 30, 1999 Sec. 60.2615 What must I do if I plan to permanently close my CISWI unit and not restart it? If you plan...


Construction On or Before November 30, 1999 Sec. 60.2620 What is a waste management plan? A waste management plan is a written plan that...


Construction On or Before November 30, 1999 Sec. 60.2625 When must I submit my waste management plan? You must submit a waste management plan no...


Construction On or Before November 30, 1999 Sec. 60.2630 What should I include in my waste management plan? A waste management plan must...


Construction On or Before November 30, 1999 Sec. 60.2635 What are the operator training and qualification requirements? (a) No CISWI unit can...


Construction On or Before November 30, 1999 Sec. 60.2640 When must the operator training course be completed? The operator training course must...


Construction On or Before November 30, 1999 Sec. 60.2645 How do I obtain my operator qualification? (a) You must obtain operator qualification...


Construction On or Before November 30, 1999 Sec. 60.2650 How do I maintain my operator qualification? To maintain qualification, you must complete...


Construction On or Before November 30, 1999 Sec. 60.2655 How do I renew my lapsed operator qualification? You must renew a lapsed...


Construction On or Before November 30, 1999 Sec. 60.2660 What site-specific documentation is required? (a) Documentation must be available at...


Construction On or Before November 30, 1999 Sec. 60.2665 What if all the qualified operators are temporarily not accessible? If all...


Construction On or Before November 30, 1999 Sec. 60.2670 What emission limitations must I meet and by when? You must meet the emission...


Construction On or Before November 30, 1999 Sec. 60.2675 What operating limits must I meet and by when? (a) If you use a wet scrubber to...


Construction On or Before November 30, 1999 Sec. 60.2680 What if I do not use a wet scrubber to comply with the emission limitations? If you use an...


Construction On or Before November 30, 1999 Sec. 60.2685 What happens during periods of startup, shutdown, and malfunction? (a) The...


Construction On or Before November 30, 1999 Sec. 60.2690 How do I conduct the initial and annual performance test? (a) All performance tests...


Construction On or Before November 30, 1999 Sec. 60.2695 How are the performance test data used? You use results of performance tests to...


Construction On or Before November 30, 1999 Sec. 60.2700 How do I demonstrate initial compliance with the emission limitations and establish the...


Construction On or Before November 30, 1999 Sec. 60.2705 By what date must I conduct the initial performance test? The initial performance test must...


Construction On or Before November 30, 1999 Sec. 60.2710 How do I demonstrate continuous compliance with the emission limitations and the...


Construction On or Before November 30, 1999 Sec. 60.2715 By what date must I conduct the annual performance test? You must conduct annual...


Construction On or Before November 30, 1999 Sec. 60.2720 May I conduct performance testing less often? (a) You can test less often for a...


Construction On or Before November 30, 1999 Sec. 60.2725 May I conduct a repeat performance test to establish new operating limits? (a) Yes. You...


Construction On or Before November 30, 1999 Sec. 60.2730 What monitoring equipment must I install and what parameters must I monitor? (a) If you...


Construction On or Before November 30, 1999 Sec. 60.2735 Is there a minimum amount of monitoring data I must obtain? (a) Except for...


Construction On or Before November 30, 1999 Sec. 60.2740 What records must I keep? You must maintain the 13 items (as applicable) as specified...


Construction On or Before November 30, 1999 Sec. 60.2745 Where and in what format must I keep my records? All records must be available onsite...


Construction On or Before November 30, 1999 Sec. 60.2750 What reports must I submit? See Table 5 of this subpart for a summary of the...


Construction On or Before November 30, 1999 Sec. 60.2755 When must I submit my waste management plan? You must submit the waste management plan...


Construction On or Before November 30, 1999 Sec. 60.2760 What information must I submit following my initial performance test? You must submit...


Construction On or Before November 30, 1999 Sec. 60.2765 When must I submit my annual report? You must submit an annual report no later than 12...


Construction On or Before November 30, 1999 Sec. 60.2770 What information must I include in my annual report? The annual report required under...


Construction On or Before November 30, 1999 Sec. 60.2775 What else must I report if I have a deviation from the operating limits or the...


Construction On or Before November 30, 1999 Sec. 60.2780 What must I include in the deviation report? In each report required under Sec. 60.2775,...


Construction On or Before November 30, 1999 Sec. 60.2785 What else must I report if I have a deviation from the requirement to have a qualified...


Construction On or Before November 30, 1999 Sec. 60.2790 Are there any other notifications or reports that I must submit? Yes. You must...


Construction On or Before November 30, 1999 Sec. 60.2795 In what form can I submit my reports? Submit initial, annual, and deviation...


Construction On or Before November 30, 1999 Sec. 60.2800 Can reporting dates be changed? If the Administrator agrees, you may change the semiannual...


Construction On or Before November 30, 1999 Sec. 60.2805 Am I required to apply for and obtain a title V operating permit for my unit? Yes. Each...


Construction On or Before November 30, 1999 Sec. 60.2810 What is an air curtain incinerator? (a) An air curtain incinerator operates by...


Construction On or Before November 30, 1999 Sec. 60.2815 What are my requirements for meeting increments of progress and achieving final compliance? ...


Construction On or Before November 30, 1999 Sec. 60.2820 When must I complete each increment of progress? Table 1 of this subpart specifies...


Construction On or Before November 30, 1999 Sec. 60.2825 What must I include in the notifications of achievement of increments of progress? ...


Construction On or Before November 30, 1999 Sec. 60.2830 When must I submit the notifications of achievement of increments of progress? ...


Construction On or Before November 30, 1999 Sec. 60.2835 What if I do not meet an increment of progress? If you fail to meet an increment...


Construction On or Before November 30, 1999 Sec. 60.2840 How do I comply with the increment of progress for submittal of a control plan? For...


Construction On or Before November 30, 1999 Sec. 60.2845 How do I comply with the increment of progress for achieving final compliance? For the...


Construction On or Before November 30, 1999 Sec. 60.2850 What must I do if I close my air curtain incinerator and then restart it? (a) If you...


Construction On or Before November 30, 1999 Sec. 60.2855 What must I do if I plan to permanently close my air curtain incinerator and not restart it? ...


Construction On or Before November 30, 1999 Sec. 60.2860 What are the emission limitations for air curtain incinerators? (a) After the date the...


Construction On or Before November 30, 1999 Sec. 60.2865 How must I monitor opacity for air curtain incinerators? (a) Use Method 9 of appendix A...


Construction On or Before November 30, 1999 Sec. 60.2870 What are the recordkeeping and reporting requirements for air curtain incinerators? ...


Construction On or Before November 30, 1999 Sec. 60.2875 What definitions must I know? Terms used but not defined in this subpart are defined...




PEO7.com 23945 Calabasas Rd. Suite 106, Calabasas, CA 91302 818-222-4572 cs@peo7.com
SiteMap  | Employee Leasing  | Exploring the Possibilities  | What is Employee Leasing  | Why use a Peo  | Free Advice  | Benefits to  Employees  |  Responsibilities of PEO  | Benefit Package  | HR Management  | Pre-Employment Screening  | The Issue of Control  |  Future of PEO |  Request For Proposal (RFP)  | Contact Us  | Peo Resources |  Terms of Service | FAQ