Title 30--MINERAL RESOURCES
Chapter


be disturbed by underground mining activities, unless the regulatory authority specifically authorizes underground mining activities closer to, or through, such a stream....


the coal, while utilizing the best technology currently available to maintain environmental integrity, so that reaffecting the land in the future through surface coal...


underground coal mining, including, but not limited to, initial rounds of slopes and shafts. (b) Each operator shall comply with all applicable State and Federal laws...


in writing, all residents or owners of dwellings or other structures located within \1/2\ mile of the permit area how to request a preblasting survey. (b) A resident...


the blasting site and local governments of the proposed times and locations of blasting operations. Such notice of times that blasting is to be conducted may be announced...


Sec. 817.11. The operator shall-- (1) Conspicuously place signs reading ``Blasting Area'' along the edge of any blasting area that comes within 100 feet of...


persons, damage to public or private property outside the permit area, adverse impacts on any underground mine, and change in the course, channel, or availability of surface...


request, copies of these records shall be made available to the regulatory authority and to the public for inspection. Such records shall contain the following data: ...




PEO7.com 23945 Calabasas Rd. Suite 106, Calabasas, CA 91302 818-222-4572 cs@peo7.com
SiteMap  | Employee Leasing  | Exploring the Possibilities  | What is Employee Leasing  | Why use a Peo  | Free Advice  | Benefits to  Employees  |  Responsibilities of PEO  | Benefit Package  | HR Management  | Pre-Employment Screening  | The Issue of Control  |  Future of PEO |  Request For Proposal (RFP)  | Contact Us  | Peo Resources |  Terms of Service | FAQ