Title 30--MINERAL RESOURCES
Chapter


be disturbed by surface mining activities, unless the regulatory authority specifically authorizes surface mining activities closer to, or through, such a stream. The...


while utilizing the best appropriate technology currently available to maintain environmental integrity, so that reaffecting the land in the future through surface coal...


regulations in the use of explosives. (b) Blasts that use more than 5 pounds of explosive or blasting agent shall be conducted according to the schedule required under...


writing, all residents or owners of dwellings or other structures located within \1/2\ mile of the permit area how to request a preblasting survey. (b) A resident or owner of...


times approved by the regulatory authority and announced in the blasting schedule. The regulatory authority may limit the area covered, timing, and sequence of blasting as listed...


Sec. 816.11. The operator shall-- (1) Conspicuously place signs reading ``Blasting Area'' along the edge of any blasting area that comes within 100 feet of any...


persons, damage to public or private property outside the permit area, adverse impacts on any underground mine, and change in the course, channel, or availability of surface...


request, copies of these records shall be made available to the regulatory authority and to the public for inspection. Such records shall contain the following data: ...




PEO7.com 23945 Calabasas Rd. Suite 106, Calabasas, CA 91302 818-222-4572 cs@peo7.com
SiteMap  | Employee Leasing  | Exploring the Possibilities  | What is Employee Leasing  | Why use a Peo  | Free Advice  | Benefits to  Employees  |  Responsibilities of PEO  | Benefit Package  | HR Management  | Pre-Employment Screening  | The Issue of Control  |  Future of PEO |  Request For Proposal (RFP)  | Contact Us  | Peo Resources |  Terms of Service | FAQ