[Code of Federal Regulations] [Title 30, Volume 3] [Revised as of July 1, 2003] From the U.S. Government Printing Office via GPO Access [CITE: 30CFR783.1] [Page 240] TITLE 30--MINERAL RESOURCES THE INTERIOR PART 783--UNDERGROUND MINING PERMIT APPLICATIONS--MINIMUM REQUIREMENTS FOR INFORMATION ON ENVIRONMENTAL RESOURCES--Table of Contents Sec. 783.1 Scope. This part establishes the minimum requirements for the Secretary's approval of regulatory program provisions for the environmental resources contents of applications for permits for underground mining activities. ...


the regulatory authority a complete and accurate description of the environmental resources that may be impacted or affected by proposed underground...


exempted in this part, all information required by this part in the application. (b) It is the responsibility of State and Federal Government agencies to...


783.13, 783.14, 783.15, 783.16, 783.17, 783.18, 783.19, 783.21, 783.22, 783.23, 783.24 and 783.25 have been approved by the Office of Management and Budget under...


environmental resources within the proposed permit area and adjacent areas that may be affected or impacted by the proposed underground mining...


(a) The lands subject to surface coal mining operations over the estimated life of those operations and the size, sequence, and timing of the subareas for which it...


contain a statement of the climatological factors that are representative of the proposed permit area, including-- (1) The average seasonal precipitation; ...


contain a map that delineates existing vegetative types and a description of the plant communities within the area affected by surface operations and facilities...


those portions of the permit area to be affected by surface operations or facilities consisting of the following: (1) A map delineating different soils; (2)...


(a) All boundaries of lands and names of present owners of record of those lands, both surface and sub-surface, included in or contiguous to the permit area; (b)...


and plans showing-- (1) Elevations and locations of test borings and core samplings; (2) Elevations and locations of monitoring stations used to gather data on...


provisions for the mining operations and reclamation plans portions of applications for permits for underground mining activities, except to the extent that...


comprehensive and reliable information on proposed underground mining activities, and to ensure that those activities are allowed to be conducted only in compliance with the...


all of the information required by this part, except where specifically exempted in this part. (b) It is the responsibility of State and Federal governmental...


Office of Management and Budget under 44 U.S.C. 3501 et seq. and assigned clearance number 1029-0039. The information will be used to meet the requirements of 30...


operations proposed to be conducted during the life of the mine within the proposed permit area, including, at a minimum, the following: (a) A narrative description of...




PEO7.com 23945 Calabasas Rd. Suite 106, Calabasas, CA 91302 818-222-4572 cs@peo7.com
SiteMap  | Employee Leasing  | Exploring the Possibilities  | What is Employee Leasing  | Why use a Peo  | Free Advice  | Benefits to  Employees  |  Responsibilities of PEO  | Benefit Package  | HR Management  | Pre-Employment Screening  | The Issue of Control  |  Future of PEO |  Request For Proposal (RFP)  | Contact Us  | Peo Resources |  Terms of Service | FAQ